Skip to content

CANEL ELEKTRİK

Shopping mall electrical works: defining landlord and tenant scope

AI-generated cutaway illustration of electrical infrastructure in a fictional production facility.
AI-generated illustrative image; it does not depict an actual CANEL project.

Technical Guides

Prepared by
CANEL Elektrik
Published
Reading time
2 min

Define main distribution, common-area lighting, tenant feeds and store handover before tendering electrical works for a shopping centre.

The first step in selecting a shopping mall electrical contractor is to separate the landlord’s common-area works from the electrical fit-out inside each store. Main distribution, common-area lighting and dozens of tenant feeds can share an opening programme. Define what will be ready at the point of tenant handover so bidders price comparable work.

What belongs in the main distribution and common-area package?

Ask for separate bid lines for main and distribution boards, common-area lighting and controls, equipment supplies and metering. Allocate field connections, device supply and systems integration. An electrical contracting responsibility matrix helps define the boundaries between the landlord, main contractor and tenant fit-out contractor.

Mark the store handover boundary on the drawings

For each unit, record the supply handover point, allocated load, metering responsibility and where the available cable route ends. If the tenant board, final circuits and luminaires are priced separately, show those items on the bid form. Agree which drawing controls when layouts change and how revisions will be priced.

Assess the opening programme alongside references

Show common-area handover and store openings as separate milestones. Ask bidders which packages they delivered on comparable shopping centres or large retail developments, which handover records they provided and what was excluded. CANEL’s electrical services and published project portfolio give you a starting point for discussing comparable scopes. Include the unit schedule, single-line diagram and opening phases when you get in touch.

Sources

← Back to all news