Prepare a textile factory electrical RFQ around the equipment schedule, switchboard capacity, phasing and handover records.

Prepare a textile factory electrical RFQ around the equipment schedule, switchboard capacity, phasing and handover records.

Make the equipment schedule the basis of the RFQ

Give each textile factory electrical contractor the same schedule. For each machine, include the manufacturer’s supply data, installation location, commissioning phase and party responsible for connection. Review existing measurements with the design team when comparing the demand profiles of weaving, dyeing and utility equipment. Start with the electrical RFQ responsibility matrix.

Separate existing switchboards from new field connections

Mark which parts of the existing distribution will be retained and which switchboards, containment and field connections are new. Ask bidders to explain production downtime windows, temporary operating boundaries and the sequence in which machines will be commissioned. Two offers covering the same machine count can allocate these responsibilities differently.

Match textile references to the work package

Compare the published MV and LV scope of Yasin Textile Factory 1 with the actual work package you need. Include current drawings, relevant field test records and responsibilities for joint commissioning with the machine vendor in the acceptance plan. Share your equipment schedule and project scope with CANEL.

Explore this scope through related references and guides