How to plan renewable electricity for factories

Solar panels on a factory roof
AI-generated illustration.

Technical Guides

Prepared by
CANEL Elektrik
Published
Updated
Reading time
2 min

Plan factory rooftop solar and renewable electricity procurement around load profiles, grid connection, metering and commissioning.

Factory renewable electricity planning starts with when the site uses power. To compare rooftop solar PV with contracted renewable electricity, review shift, weekend and seasonal consumption over matching periods.

Load profile and self-consumption

Use hourly or finer metering where available. Compare periods of high solar output with machinery, compressor and cooling demand. Estimated generation, annual consumption and electricity the site can use directly are separate figures. Model weekends with low demand and future production-line additions separately.

Electrical infrastructure and the bid scope

Provide the single-line diagram, proposed connection point, switchboard capacity and metering boundary. Qualified specialists should assess roof suitability, electrical protection and grid connection. Assign responsibility for equipment, field connections, monitoring and commissioning tests. Confirm grid connection conditions with the relevant distribution operator.

Acceptance and operation

Include generation and consumption meter checks, alarm notifications and operating records in the acceptance plan. Compare rooftop PV and contracted procurement using the same view of pricing structure, maintenance, generation variability and evidence of supply. Confirm the electrical scope with your project team and explore CANEL’s electrical contracting services.