
Canel Elektrik İnşaat carried out low-voltage electrical installations, low-current systems and lighting automation works for the Şişhane Beyoğlu Tunnel project undertaken by Atlas İnşaat. Low-voltage (LV) works included installation and wiring of sub-distribution panels, pulling power and control cables, internal panel connections and field electrical installations. Low-current works covered cabling, equipment connections and field installations for CCTV cameras, emergency announcement and public address systems and communication infrastructure. Installation works for the different electrical and low-current systems were implemented in accordance with the tunnel’s technical requirements.
Client
Atlas İnşaat Tic. San. Ltd. Şti.
Location
İstanbul / Türkiye
Project Type
Transportation