
Canel Elektrik İnşaat completed the electrical infrastructure and installation works for the 5,000 m² oncology area within the Abdi İbrahim New Production Facility (YÜT). The scope included low-voltage (LV) systems, busbar distribution infrastructure, cable support systems, interior and emergency lighting, and lighting automation. Electrical and ELV installations were also provided for structured cabling, fire detection and alarm, CCTV, card access control, and voice evacuation and public address systems. BIM modelling and coordination, clash detection and as-built documentation were carried out as part of the project. These works reflect Canel Elektrik İnşaat’s experience in electrical distribution, ELV systems and technical coordination for pharmaceutical production facilities.
Client
Abdi İbrahim İlaç San. A.Ş.
Location
İstanbul / Türkiye
Area
5.000 m²
Project Type
Pharmaceutical